| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
1.) Identify tools and fasteners used in metal stud systems.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
2.) Demonstrate the installation of a metal stud wall according to specifications.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
3.) Demonstrate the installation of a metal doorframe according to specifications.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
4.) Demonstrate the installation of a metal stud radius wall according to specifications.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
5.) Identify components of a wall and ceiling layout.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
6.) Identify common materials and methods used for installing sheathing on walls.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
7.) Construct exterior walls for a frame building, including laying out, assembling, erecting, and bracing to specifications.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
8.) Demonstrate wall framing techniques used in masonry construction.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
9.) Demonstrate the installation of ceiling joists on a wood frame building according to specifications.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
10.) Calculate an estimate of materials required to frame walls and ceilings.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
11.) Demonstrate methods used to calculate the length of a rafter.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
12.) Identify various types of trusses used in roof framing.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
13.) Construct framing for a gable roof with vent openings according to specifications.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
14.) Construct framing for a roof opening according to specifications.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
15.) Use trusses to erect a gable roof according to specifications.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
16.) Estimate materials used in framing and sheathing a roof.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
17.) Install a pre-hung window.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
18.) Install a pre-hung exterior door with a lockset.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Carpentry II |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
19.) Demonstrate the installation of stringers, risers, and treads for a stair system according to specifications.
19.) Constructing a handrail for a stair system
|