Architecture and Construction, Grade 9 - 12, Applied Welding III Groove Welds and Inspection, 2009
1.) Demonstrate safety procedures used for the SMAW process.
|
|
2.) Describe groove welds with and without backing.
|
|
3.) Perform tasks needed to prepare carbon steel material for groove welds.
|
|
4.) Demonstrate correct techniques for groove welding a butt joint with the backing plate in the 1-G flat position and in the 2-G horizontal position.
|
|
5.) Demonstrate correct techniques for groove welding an open root butt joint in the 1-G flat position and in the 2-G horizontal position.
|
|
6.) Prepare the weld coupon for performance testing in 1-G and 2-G positions with and without the backing plate.
|
|
7.) Interpret applicable codes and standards of welding credential issuing agencies.
Example: American Welding Society (AWS).
|