| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Basic Compression Refrigeration |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
1.) Demonstrate safety rules, regulations, and procedures for HVACR.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Basic Compression Refrigeration |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
2.) Draw a basic refrigeration system, including refrigerant flow, components, and lines.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Basic Compression Refrigeration |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
3.) Demonstrate the procedure for installing filter dryers.
Examples: liquid-line filter dryer, suction-line filter dryer
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Basic Compression Refrigeration |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
4.) Demonstrate the procedure for installing and removing a gauge set.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Basic Compression Refrigeration |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
5.) Demonstrate pressure temperature conversion procedures.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Basic Compression Refrigeration |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
6.) Determine pressures and temperatures on domestic and commercial refrigeration systems.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Basic Compression Refrigeration |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
7.) Demonstrate industry-recognized evacuation procedures for a refrigeration system.
Example: triple evacuation
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Basic Compression Refrigeration |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
8.) Demonstrate the detection and repair of a refrigerant leak.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Basic Compression Refrigeration |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
9.) Demonstrate the process of charging a refrigeration system.
Examples: weigh-in, superheat, subcooling
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Basic Compression Refrigeration |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
10.) Demonstrate the removal and replacement of a major refrigeration component.
Examples: compressor, metering device, condenser, evaporator
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Basic Compression Refrigeration |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
11.) Describe the operation of basic components of a refrigeration system.
Identifying operation of refrigeration accessories
Examples: accumulators, sight glass
|