| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating, Ventilation, Air-Conditioning and Refrigeration Electrical Components and Controls |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
1.) Demonstrate safety rules, regulations, and procedures when working with electrical circuits used in HVACR systems.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating, Ventilation, Air-Conditioning and Refrigeration Electrical Components and Controls |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
2.) Demonstrate techniques involved with assembly and disassembly of a single-phase motor.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating, Ventilation, Air-Conditioning and Refrigeration Electrical Components and Controls |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
3.) Determine resistance of windings in a split-phase motor to identify start-run windings.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating, Ventilation, Air-Conditioning and Refrigeration Electrical Components and Controls |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
4.) Determine common start and run terminals of a single-phase compressor motor.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating, Ventilation, Air-Conditioning and Refrigeration Electrical Components and Controls |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
5.) Demonstrate preventive maintenance procedures for a window air conditioner.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating, Ventilation, Air-Conditioning and Refrigeration Electrical Components and Controls |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
6.) Demonstrate the procedure for replacing a double-shaft fan motor.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating, Ventilation, Air-Conditioning and Refrigeration Electrical Components and Controls |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
7.) Demonstrate troubleshooting techniques to solve electrical problems encountered in HVACR electrical systems.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating, Ventilation, Air-Conditioning and Refrigeration Electrical Components and Controls |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
8.) Demonstrate procedures used for replacing electrical components in an HCACR system.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating, Ventilation, Air-Conditioning and Refrigeration Electrical Components and Controls |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
9.) Interpret schematic wiring diagrams for HVACR systems and system components.
|