| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating and Heat Pump Systems |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
1.) Demonstrate safety rules, regulations, and procedures for heating, ventilation, air-conditioning, and refrigeration (HVACR).
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating and Heat Pump Systems |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
2.) Determine temperature rise across a gas furnace.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating and Heat Pump Systems |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
3.) Determine the condition of a combustion chamber.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating and Heat Pump Systems |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
4.) Practice techniques for heating system component replacement.
Examples: fan-limit control, gas valve, transformer, wall thermostat, blower motor
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating and Heat Pump Systems |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
5.) Determine airflow for a heat pump.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating and Heat Pump Systems |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
6.) Determine the condition of a heating element.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating and Heat Pump Systems |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
7.) Determine the condition of motor and blower for HVACR systems.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating and Heat Pump Systems |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
8.) Demonstrate the procedure for checking sequencers.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating and Heat Pump Systems |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
9.) Describe components of an electric heat pump.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating and Heat Pump Systems |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
10.) Demonstrate the procedure to test and replace components of an electric heat pump.
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating and Heat Pump Systems |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
11.) Perform preventive maintenance on HVACR equipment.
Examples: gas-fueled equipment, electric heating equipment, forced-air furnaces, air handlers, electronic air cleaners, humidifiers, indoor and outdoor heat pump coils
|
| Architecture and Construction (2009) |
| Grade(s): 9 - 12 |
| Heating and Heat Pump Systems |
| All Resources: |
0 |
| Learning Assets: |
0 |
| Lesson Plans: |
0 |
| Podcasts: |
0 |
| Web Resources: |
0 |
|
12.) Estimate material and labor costs for HVACR system installation and repairs.
|